The Mahindra XUV 3XO, a popular sub-four-metre SUV, has been in high demand, leading to significant waiting periods for different variants. Competing with models like the Tata Nexon, Maruti Brezza, Kia Sonet, Hyundai Venue, Nissan Magnite, and Renault Kiger, the XUV 3XO has seen a surge in bookings. As of March 2025, the waiting period for certain variants extends up to one year, making it one of the longest in this segment.
Table of Contents
MX1 Variant
Customers opting for the base MX1 variant will face the longest waiting period. Currently, the wait time for this variant stretches up to 52 weeks, meaning buyers may have to wait for nearly a year before getting their hands on the SUV.
MX2, MX2 Pro, MX3, and MX3 Pro
For these mid-range variants, the waiting period varies based on fuel type:
- Petrol versions – up to 10 weeks
- Diesel versions – up to 2 weeks
AX5 Variant
The AX5 variant also sees different wait times for petrol and diesel models:
- Petrol version – up to 8 weeks
- Diesel version – up to 2 weeks
Other Variants
All other variants of the XUV 3XO have a relatively short and uniform waiting period of up to 2 weeks, making them the quickest to be delivered.
High Demand
The long waiting periods for the XUV 3XO indicate the SUV’s strong market presence. Mahindra’s aggressive pricing, feature-loaded variants, and a strong brand reputation contribute to its popularity. However, production constraints and high demand have resulted in extended waiting times, particularly for entry-level models.
To tackle the high demand, Mahindra may ramp up production in the coming months. Customers looking for quicker delivery might consider higher variants, which have shorter wait times.
For those planning to buy the XUV 3XO, keeping an eye on waiting period updates and checking with local dealers for variant-specific availability can help in making a quicker purchase decision.
FAQs
What is the waiting period for the XUV 3XO MX1 variant?
The MX1 variant has a waiting period of up to 52 weeks.
How long is the wait for MX2 and MX3 petrol versions?
Petrol variants of MX2, MX2 Pro, MX3, and MX3 Pro have a wait time of 10 weeks.
What is the waiting time for the AX5 variant?
The AX5 petrol variant has an 8-week wait, while the diesel version takes 2 weeks.
Which XUV 3XO variants have the shortest waiting time?
All variants except MX1, MX2, MX3, and AX5 have a waiting period of just 2 weeks.
Why is the XUV 3XO waiting period so long?
High demand and production constraints have led to extended waiting times.